Complete RollerCoaster Tycoon Big Pier 2 scenario walkthrough. Goal: 1,200 guests by end of Year 2, park rating 600.
Walkthrough
- 1Use banners to block off unused paths to maintain park rating and prevent guest confusion.
- 2Build custom rides underneath paths to increase excitement and save space.
- 3Focus on increasing guest numbers to reach the goal of 1,200 guests by the end of October, Year 2.
- 4Ensure your park rating reaches at least 600 by the end of the scenario.
Tips
- Let loose with advertising once your finances are stable to reach your goal faster.
- Experiment and plan long-term, as there is no time limit.
- Consider building rides that boost excitement ratings.
Details:
- Scenario Name: Big Pier 2
- Goal: 1,200 guests by the end of October, Year 2, with a park rating of at least 600.
- Starting Loan: $10,000
- Maximum Loan: $20,000
- Starting Staff: 2 (1 Handyman, 1 Mechanic)
- Land Available to Buy: No
- Construction Rights Available to Buy: No
- Starting Guests: 468
- Park Open at Start: Yes
- Available Rides: Wooden Side Friction, Steel Mini, Steel (Roller Coasters); Scrambled Eggs, Enterprise, Log Flume (Thrill Rides); Crooked House, Haunted House, Ferris Wheel, Merry Go Round, Car Ride, Spiral Slide, Boat Hire, Monorail (Gentle Rides).
- Available Shops/Stalls: Fries Stall, Coffee Shop, Drink Stall, Information Kiosk, Bathroom.
- Available Scenery/Theming: Trees, Shrubs and Bushes, Tropical and Desert Trees, Gardens, Path Items, Walls and Fences, Statues and Fountains.
- Researchable Rides: A long list including Wooden Crazy Rodent, Virginia Reel, Steel Corkscrew, Roto Drop, River Ride, Water Slide, Circus Show, Cycle Railway, Miniature Golf, and many more.
- Starting Rides: Bathroom 1, Boat Hire 1, Enterprise 1, Ferris Wheel 1, Fries Stall 1, Haunted House 1, Log Flume 1, Merry Go Round 1, Steel Mini Roller Coaster 1, Scrambled Eggs 1.
100% Human-Written. AI Fact-Checked. Community Verified. Learn how AntMag verifies content